Draper Signature E Manual
Draper
Projektionslærred
Signature E
Læs nedenfor 📖 manual på dansk for Draper Signature E (3 sider) i kategorien Projektionslærred. Denne guide var nyttig for 2 personer og blev bedømt med 4.5 stjerner i gennemsnit af 2 brugere
Side 1/3
Limit Adjustments
Please Note: Screen limits are factory set for optimum performance of the
screen. A procedure is outlined below for minor tweaks, but any adjustment
of these limits may negatively affect the flatness of the screen surface and
could also void the warranty. Please check with Draper prior to resetting
screen limits.
CAUTION: Always be prepared to shut screen off manually when new
adjustment is being tested. Screen may be severely damaged if viewing
surface is allowed to run too far up or too far down.
CAUTION: Be sure all switches are in “off” position before adjusting limit
switches.
The motor limit screws are normally located on the audience left of screen roller.
"Down" Limit Adjustment
To Reduce Screen Drop
1 Raise screen surface about 1' above desired setting and turn off.
2 Turn the WHITE/DOWN limit screw clockwise (3 screw turns=½ roller revolution).
3 Test by running screen down and repeat steps 1 and 2 until desired position is
reached.
To Increase Screen Drop
1 Run screen to the down limit.
2 With the down switch on, turn the WHITE/DOWN limit screw counterclockwise
(three turns of screw = ½ roller revolution) to increase drop.
3 Test by running screen up about 1' and back down to new down limit.
4 Repeat steps 2 and 3 until desired position is reached.
"Up" Limit Adjustment
Screen is Running Too Far Up
1 Lower screen surface about 1' below desired setting and turn off.
2 Turn the YELLOW/UP limit screw clockwise (3 screw turns = ½ roller revolution).
3 Test by running screen up.
4 Repeat steps 1 through 3 until desired position is reached.
Screen Needs to Run Up More
1 Run screen down about 1' and turn off.
2 With the up switch on, turn the YELLOW/UP limit screw counterclockwise (three
turns of screw = ½ roller revolution).
3 Repeat steps 1 and 2 until desired position is reached.
CAUTION: Do NOT allow the dowel to wrap up over the roller when the
screen is running up! This could damage the screen.
Installation/Operating Instructions
Signature/Series E & V Electric Projection Screen by Draper
Operation
Please Note: Screen limits are factory set for optimum performance of the screen.
Any adjustment of these limits could void the warranty. Please check with Draper
prior to resetting screen limits.
CAUTION—Important Instructions—Signature/Series V—The shipping support
bracket must be removed from the dowel during initial operation before screen is
operated in UP direction. After screen is installed, run viewing surface DOWN to access
and remove bracket. Signature/Series E—The protective paper wrapping around the
viewing surface must be removed before the screen is operated in down direction. Cycle
viewing surface down and up several times to confirm satisfactory operation. If viewing
surface or trap door do not operate properly, turn power off and free trap door and/or
check electrical connections.
When screen is first operated, If automatic trap door does not open be cautious!
immediately up into screen case when switch is flipped “down”, return switch to “off” and
free trap door and/or recheck electrical connections before proceeding. Cycle unit down
and up several times to confirm satisfactory operation.
110-120V Single Station Control—3-position UP-OFF-DOWN switch permits
operation to be stopped at any point. Factory adjusted limit switches automatically stop
screen when fully down or fully up.
110-120V Multiple Station Control—Switches are similar in appearance to 110-120V
Single Station Control. Screen stops when switch is released and may be restarted in
either direction. Factory adjusted limit switches stop screen automatically when fully
down or fully up.
24V Control—Three-button UP-STOP-DOWN switches stop at any point desired,
operate in any sequence. Factory adjusted limit switches automatically stop screen
when fully down or fully up. Wireless controls—whether infrared or radio frequency—
interface with the low voltage control box (see wiring diagram on reverse).
Key Operated Switching—Two kinds of key-operated switches are optionally available
with this unit. The key-operated power supply switch controls power to the screen 1
and switches. When it is “off”, the switches will not operate screen. Key may be removed
from the switch in either “on” or “off” position. A three-position key switch permits the 2
screen to be operated directly by key. In this case, the screen’s operator must always
have a key.
RS232/Ethernet—Serial communication and network communication optionally
available with wall switches, RF or IR remote.
Hanging Screen
When locating viewing surface and checking clearance for screen’s operation,
remember surface is centered in case. Screen is normally recessed above ceiling
and may be installed in a variety of ways. See typical installations detailed on back
of this sheet. Regardless of mounting method used, the following points apply:
1 Screen should be lifted into position only by the end mounting brackets.
Keep case level by lifting end plates simultaneously to prevent surface
damage. Never attempt to lift screen along its length.
2 Screen should be positively and securely supported so that vibration or even
abusive pulling on viewing surface will not weaken installation.
3 Installer must insure that fasteners used are of adequate strength and suitable
for the mounting surface chosen.
4 Entire bottom of case must be readily accessible after installation is complete.
5 Hinge that connects bottom panel and automatic trap door of screen must be
permitted to operate freely. Front and back of case must be straight—not forced
to warp or bow. Hinges must be free from mastic or paint buildup, and doors
must be unobstructed by ceiling tiles.
6 Do not use screen case to support adjacent sections of ceiling.
7 If trim pieces must be attached to case, do not permit screws to protrude more
than 1/4" through 1/8" wall of case. Do attach trim pieces with nails.not
8 If case is painted, slots on bottom of case should be shielded to protect viewing
surface from paint splatters or overspray.
9 Do not seal unit in ceiling until electrical connections have been made and
screen has been operated successfully.
Copyright © 2014 Draper Inc. Form SignatureE&V_Inst14 Printed in U.S.A.
Caution
1 Read instructions through completely before proceeding. Follow instructions
carefully. Installation contrary to instructions invalidates warranty.
2 Pick up screen case from ends only. Picking case up at other points will damage
case and .may damage fabric
3 To insure a safe installation, the of the unit MUST BE supported by entire weight
the end-plates.
4 Entire bottom of screen case should be unobstructed to permit proper operation of
automatic trap door, and access to bottom panel for making electrical connections
or servicing.
5 Screen should be installed level (using a carpenter’s level).
6 Nothing should be fastened to screen dowel or viewing surface.
7 Operating switch(es) is packed separately in screen carton. Do not discard with
packing material.
8 Screen operates on 110-120V, 60 Hz., 1.1 amp current draw for models using
small case; 1.3 for models using large case (see page 2).
NOTE: Screen has been thoroughly inspected and tested at factory and found to be
operating properly prior to shipment.
These instructions are meant as a guide only. They do not imply any responsibility on
the part of Draper, Inc. for improper installation or faulty workmanship at the jobsite.
Please Note: Instructions for adjusting Draper’s Tab-Tension System for Series V
screens are on page 2.
If you encounter any difficulties installing or servicing your Signature, call your dealer or
Draper, Inc., Spiceland, Ind., (765) 987-7999 or fax (765) 987-7142.
Suitable for use in environmental air space in accordance with Section
300-22(c) of the National Electrical Code, and Sections 2-128, 12-010(3)
and 12-100 of the Canadian Electrical Code, Part 1, CSA C22.1.
Brackets installed with rivets at factory.
Bracket spacing:
•SmallCaseConstruction/Eor/V
-Case length <95"-no brackets required
-Case length >95"-1 bracket centered
•LargeCaseConstruction/Eor/V
-2 brackets equally spaced
3/ " (9.5mm) -16 threaded rod8
(use for suspending
screen) by others.
Case support
bra ets NOTck .
for use in
supporting
weight of case.
5/ " (8mm)-18 threaded rod16
(use for adjusting
deflection) by others.
3/ " (9.5mm)-16 threaded rod8
(use for suspending
screen) by others.
Electrical Connections
Screen operates on 110-120v, 60 Hz., 1.1 amp current draw for models using
small case; 1.3 for models using large case (see page 2). Junction box is located
just above the access plate at left end of screen. (See chart on back of this sheet.)
Access plate is held closed with flathead screws and may be opened with a
Phillips screwdriver. Automatic trap door does not need to be opened to make field
connections. Removal of access plate exposes red, black and white pigtail leads
and green internal ground wire per wiring diagram attached. Screen is shipped with
internal wiring complete and control switch(es) fully boxed. Wire connecting screen
to switch(es) and switch(es) to power supply should be furnished by installer.
Connections should be made in accordance with attached wiring diagram, and
wiring should comply with National and local electrical codes.
All Operating Switches Should Be “Off” Before Power Is Connected.
Shipping Support Bracket
Dowel (Series V)
US Patent No.
5,341,241
Produkt Specifikationer
Mærke: | Draper |
Kategori: | Projektionslærred |
Model: | Signature E |
Har du brug for hjælp?
Hvis du har brug for hjælp til Draper Signature E stil et spørgsmål nedenfor, og andre brugere vil svare dig
Projektionslærred Draper Manualer
22 September 2024
6 September 2024
4 September 2024
9 August 2024
1 August 2024
31 Juli 2024
30 Juli 2024
30 Juli 2024
28 Juli 2024
28 Juli 2024
Projektionslærred Manualer
- Projektionslærred Pyle
- Projektionslærred Kodak
- Projektionslærred Optoma
- Projektionslærred Da-Lite
- Projektionslærred Elite
- Projektionslærred NEC
- Projektionslærred AV:link
- Projektionslærred Vestel
- Projektionslærred Oregon Scientific
- Projektionslærred GPX
- Projektionslærred Duronic
- Projektionslærred Elite ProAV
- Projektionslærred Luxburg
- Projektionslærred Elite Screens
- Projektionslærred EluneVision
- Projektionslærred Celexon
- Projektionslærred Lumene
- Projektionslærred Stewart
- Projektionslærred Avers
- Projektionslærred Instaal
- Projektionslærred KHOMO GEAR
- Projektionslærred EPV
Nyeste Projektionslærred Manualer
1 Oktober 2024
26 September 2024
19 September 2024
5 September 2024
5 September 2024
4 September 2024
4 September 2024
2 September 2024
2 September 2024
2 September 2024