Mastervolt C3-RS Manual


Læs nedenfor 📖 manual på dansk for Mastervolt C3-RS (3 sider) i kategorien Batterioplader. Denne guide var nyttig for 8 personer og blev bedømt med 4.5 stjerner i gennemsnit af 2 brugere

Side 1/3
ASTER ISION MODULAR SWITCHBOARDS
HOW TO ASSEMBLE A MASTERVISION PANEL
HOW TO LABEL A BACKLIGHT DC MODULE
AC MODULE
1. Lethal voltages exist on your vessel. Make sure all shore power, onboard
generating sources and batteries are disconnected before beginning
installation of your electrical panel.
2. AC modules will have lethal voltages on the bus bars and terminals.
Additional safety enclosures as the AC protection shield (part no. 07-09-04601-2-3)
may be required in some installations.
3. Make sure all Ac modules are bonded tot the ship’s AC ground bus. When
grouping modules together to form your panel, a single ground may be used.
Use an ohm meter to verify ground to all modules.
CAUTION GENERAL
1. Verify the modules you purchased arev configured for the source voltage
aboard your vessel / mobile. Refer to the backlight specification.
2. Installation of Mastervision panels should be completed by a person with
a thorough knowledge of marine / mobile electrical systems.
3. Wiring to and from each module should be conform to the local applicable
standards and taking into consideration the safety guidelines and measures.
Mastervolt can accept no liability for damage due to the use of the panel or
due to possible errors in the manual and the results thereof.
1. For best results, use Mastervision installation parts
2. Use connector bar 07-09-07810 and connector block
07-09-07820 to assemble the panel.
3. The mounting bolts used are M4x25
4. Secure the bolts wit hte supplied M4 nuts and O-rings.
5. To fasten the electrical panel in its frame or bulkhead use
the the stencil as supplied to cut the panelhole.
6.
connector bar
07-09-07810
connector block
07-09-07820
HOW TO INSTALL THE BACKLIGHTING SYSTEM:
The Mastervision panels have a two-state backlight system for label illumination.
The first state is a low intensity green light that illuminates the labels on the
panel to enable label viewing in low light conditions, any time the circuit is
switched ON or OFF. The second state is a higher intensity yellow DC LED
(or orange neon lamp for AC) to indicate when a circuit is switched ON.
Power must be fed to all modules with backlight capability. This is achieved by
linking all the modules together by their backlight connectors (see drawing).
Verify the backlight AC or DC voltage on each module.
Do not use connector blocks at the outside top or
bottom edge. This is where the complete panel
will be fastened to its frame or bulkhead.
backlight
5DC
Indicator wire to
load side of breaker
busbar
for 5 breakers
To place the labels on the backlight module
remove the mounting bolts and turn the module
around.
Place the label in the embossed square on the
lens. Make sure that the label is placed
correctly and the indicator led is
uncovered.
Replace the backlight module in the
original position.
Warning:
When the module is placed correctly the
indicator led is 1mm away from the
transparant front lens.
NAVIGATION
INSTRUMENTS
1mm
1mm
10/30V power supply
L phase
N neutral
connect the indicator
wire to the load side of
the breaker
10/30V power supply
10/30V DC power supply for backlight
Note:
The power supply voltages are equal on all backlight modules,
indicator voltages are depending on the type of panel.


Produkt Specifikationer

Mærke: Mastervolt
Kategori: Batterioplader
Model: C3-RS

Har du brug for hjælp?

Hvis du har brug for hjælp til Mastervolt C3-RS stil et spørgsmål nedenfor, og andre brugere vil svare dig




Batterioplader Mastervolt Manualer

Batterioplader Manualer

Nyeste Batterioplader Manualer