Sloan WES-1000 Manual
Læs nedenfor 📖 manual på dansk for Sloan WES-1000 (2 sider) i kategorien Toilet. Denne guide var nyttig for 6 personer og blev bedømt med 4.5 stjerner i gennemsnit af 2 brugere
Side 1/2
SET DRAIN LINE HEIGHT 16” from finished
floor (standard 24” rim) or 9 ” maximum for ADA
installation. Threaded nipple should extend ½ to
¾” from wall.
A. Clean face of existing wall flange.
B. Install the brass flange with the clear
inspection disc.
C. Slowly pour water into the drain.
D. Use a flashlight to check the pitch/
slope. There should be no water present in
the inspection disc or nipple.
E. Remove flange after inspection.
DRILL HOLES with
5/16" masonry bit
for the lower anchor
screws and insert
plastic anchors.
TIGHTEN
COMPRESSION
NUT AND GEAR
CLAMP.
DETERMINE THE DRAIN NIPPLE DEPTH by
measuring the distance between the back of
the sanitary tee (or elbow) to the front edge of
the nipple.
PLACE THE GEAR CLAMP
and compression nut onto
the housing tailpipe.
LEVEL THE BRACKET THEN MARK, drill and
install two additional plastic anchors and screws.
If pre-existing bearing rods can be used, screws
are not necessary.
MEASURE & MARK THE ROUGH-IN if in-wall
carrier is not used. Use a 5/16" masonry bit
to drill hole, then install the hanger bracket
with one plastic anchor and screw.
• Measure drain nipple depth (in)
to find trim length (in)
• 13 78
" or more DO NOT CUT
• 3 ¾" or less DO NOT USE TUBE
TUBE CUTTING CHART
OR LESS TRIM
13 ¾" ¼"
13 ½ ½
13 ¼ ¾
13 1
12 ¾ 1¼
12 ½ 1½
12 ¼ 1¾
12 2
11 ¾ 2¼
11 ½ 2½
11 ¼ 2¾
11 3
10 ¾ 3 ¼
10 ½ 3 ½
OR LESS TRIM
10 ¼" "3 ¾
10 4
9 ¾ 4 ¼
9 ½ 4 ½
9 ¼ 4 ¾
95
8 ¾" 5 ¼
8 ½ 5 ½
8 ¼ 5 ¾
86
7 ¾ 6 ¼
7 ½ 6 ½
7 ¼ 6 ¾
77
OR LESS TRIM
6 ¾" "7 ¼
6 ½ 7 ½
6 ¼ 7 ¾
68
5 ¾ 8 ¼
5 ½ 8 ½
5 ¼ 8 ¾
59
4 ¾ 9 ¼
4 ½ 9 ½
4 ¼ 9 ¾
410
1-888-SLOAN-14 (888-756-2614)
customer.service@sloanvalve.com
CUSTOMER SERVICE
ADJUST DRAIN TO ACHIEVE PITCH if
standing water is present (code requires ¼”
drop per foot of drain line for proper pitch).
Seal wall according to code.
A. Hang the bowl on the bracket and check tail pipe
alignment, then remove the bowl and adjust the
bracket as needed.
Re-hang and re-check bowl alignment with the drain
line. Tail pipe should align with center of drain line.
B. Mark anchor holes then
remove bowl without moving
hanger bracket.
INCORRECT
Not centered
CORRECT
Centered
A
½" ¾"to
9" MAX.
for ADA
installation
standard 24" rim
finished floor
16"
Drain
2½
6 ⁄
13 ⁄
21½
Cut away wall
Lift drain line & brace
with mending plate
21½
Install plastic anchor
and screw here
Install additional
screws here
11 10
12
A. Find the drain nipple depth on the
Tube Cutting Chart (left).
Measure and mark the specified
trim length on the insert tube at the
nearest ¼” groove.
B. at the groove using a sharp utility Cut the tube
knife to ensure a square, flat cut.
C. Clean burrs from the cut end by using emery
paper.
D. Apply lubricant to the outside of the rubber
bushing and ribbed inside area.
E. Insert the tube and bushing with arrow tab at
the top. Apply lubricant to tailpipe of housing.
Arrow
tab UP
1234
A
C
BD E
POUR 5
GALLONS
OF WATER
as rapidly
as possible
into housing
to ensure
good flow
and no leaks or
standing water.
CAULK THE BOWL TO
THE WALL.
INSTALL THE
CARTRIDGE
per the cartridge
instruction sheet.
CARTR IDG E
INSTRU C TIO N S
HANG THE BOWL, inserting
tailpipe into bushing, then install
anchor screws with washers.
TIGHTEN FLANGE BOLTS.
The information in this document is subject to change without notice.
©2018 Sloan Valve Company All rights reserved.
0816483 Rev. 5 (03-18)
sloan.com
CAUTION After removing any urinal from the
drain line, it’s normal for certain naturally occurring
but potentially hazardous sewer gases to escape
through the opening until the waterless cartridge
is installed properly into the waterless urinal. If you
need to leave an open drain line unattended after
removing the urinal from the wall, temporarily wedge paper towels or a
rag into the drain hole to reduce any outflow of sewer gases, and remove
the paper towels or rag prior to completing the urinal or cartridge
installation. Never smoke, have an open flame, or place your nose or
mouth near open drain lines or waterless urinal housings into which
a cartridge is not yet properly installed. You also can wear a breathing
mask when removing or installing any waterless urinal or cartridge to
reduce potential exposure to any such gases.
CARRIER STUD PLACEMENT If using
in-wall carrier, set bearing rods as shown
above.
B
essential because waterfree urinals depend on
gravity flow
• Check DWV material. Suitable materials include
cast iron, PVC, ABS, and galvanized steel
• Shut off water supply and cap the nipple with
the ¾" chrome cap (provided).
BEFORE STARTING INSTALLATION
WES-1000 WATERFREE URINAL
NEW CONSTRUCTION
INSTALLATION INSTRUCTIONS
IMPORTANT-Do not install on copper DWV due to copper’s
susceptibility to corrosion
•ADA requires a lip height of 17” or lower. To
allow for variances and assure compliance Sloan
recommends roughing the drain line to achieve a
16-½ ” lip height.
• Check slope. Downhill slope, per code, is B
15 16
4
14
7
3
13
9
6
2
11 1210
8
5
1
C D
Produkt Specifikationer
Mærke: | Sloan |
Kategori: | Toilet |
Model: | WES-1000 |
Har du brug for hjælp?
Hvis du har brug for hjælp til Sloan WES-1000 stil et spørgsmål nedenfor, og andre brugere vil svare dig
Toilet Sloan Manualer
19 August 2024
16 August 2024
16 August 2024
15 August 2024
15 August 2024
14 August 2024
Toilet Manualer
- Toilet Ikea
- Toilet Philips
- Toilet Thetford
- Toilet Gustavsberg
- Toilet Sanyo
- Toilet Biltema
- Toilet Milwaukee
- Toilet Campingaz
- Toilet Camry
- Toilet Dometic
- Toilet Rocktrail
- Toilet Miomare
- Toilet Haier
- Toilet Kohler
- Toilet Svedbergs
- Toilet Coleman
- Toilet Villeroy And Boch
- Toilet Duravit
- Toilet Schütte
- Toilet AXA
- Toilet Enders
- Toilet Sanibroyeur
- Toilet Separett
- Toilet Fiamma
- Toilet Ridgid
- Toilet Geberit
- Toilet Jabsco
- Toilet SereneLife
- Toilet Kogan
- Toilet Vetus
- Toilet TMC
- Toilet TOTO
- Toilet Sunwind
- Toilet Brondell
- Toilet Summer Infant
- Toilet PolyJohn
- Toilet Satellite
- Toilet Stimex
- Toilet Barumi
- Toilet MCombo
- Toilet Curaqua
- Toilet Caroma
- Toilet La Playa
Nyeste Toilet Manualer
12 Oktober 2024
3 Oktober 2024
30 September 2024
30 September 2024
29 September 2024
23 September 2024
15 September 2024
10 September 2024
10 September 2024
8 September 2024