Vango Zeya DLX 500 Manual
Læs nedenfor 📖 manual på dansk for Vango Zeya DLX 500 (1 sider) i kategorien Fuld. Denne guide var nyttig for 2 personer og blev bedømt med 4.5 stjerner i gennemsnit af 2 brugere
Side 1/1
IF YOU HAVE ANY PROBLEMS PLEASE CONTACT YOUR LOCAL RETAILER or
AMG Group Ltd., Kelburn Business Park, Port Glasgow, Scotland. PA14 6TD.
UK Consumer Hotline: 0844 811 0535 E-Mail: info@vango.co.uk
Calls to our Customer Hotline cost 5p per minute. Calls from mobile phones, cable networks or public payphones will generally cost more.
FLYSHEET FIRST PITCHING
Assemble the poles and lay them parallel on the
ground.
Open out flysheet and position in required direction.
Insert the poles through the pole sleeves on the
outside of the flysheet matching the colour of the
middle pole section to the coloured tab at the pole
sleeve end.
Locate one end of each pole on one side of flysheet,
into the Ring & Pin system at the base of the tent.
Make sure poles locate into correct pin system (all
poles follow corresponding flysheet seams to pin
system).
Push poles into an arch from opposite ends and locate
pole ends into corresponding metal pin.
Tighten the tension adjusters located on the Ring & Pin
webbing.
Start pegging out the main corners at one end of the
tent using the pin pegs provided.
Pull the tent forward until taut and peg out the main
corners at the other end of the tent, again with the pin
pegs.
Ensure the tent is in a straight line.
Secure the tent using the pin pegs through the Ring &
Pin system (see fig 2).
Peg out ALL guy lines, ensuring that they are in line
with the pole or seam they are attached to.
INNER ATTACHMENT
Suspend the inner by attaching toggles on
the inner tent through rings on the inside of
the flysheet. Do the rear first and work
towards the front of the tent.
Once fully attached, the inner can be left in
when pitching or striking the tent. However,
it is advisable to remove the inner when
striking the tent when wet.
TENSION BAND SYSTEM
1. Remove Tension Band System from pockets
and attach into the corresponding clips at
the apex of the pole. Adjust the straps until
they are taut.
2. DO NOT OVER TENSION. Excess tension will
alter the shape of the tent.
3. Tension bands are designed to stabilise the
tunnel structure of the tent. The bands are
not required to be used in calm weather.
Figure 1.
Figure 2.
Tent Pitching Instructions Zeya DLX 500 –
Ring & Pin System
1. Locate one end of each pole onto the corresponding metal pin. The metal pin inserts into the hollow
metal ferrule on the end of each pole. (See Figure 1). Push the pole into a curve from the opposite
side, one at a time, and locate all pole ends onto the metal pins.
2. Peg the corners of the tent through the metal rings using pin-pegs. It is important to drive the peg
into the ground at a 45 degree angle to obtain the best grip. (See Figure 2).
Produkt Specifikationer
Mærke: | Vango |
Kategori: | Fuld |
Model: | Zeya DLX 500 |
Har du brug for hjælp?
Hvis du har brug for hjælp til Vango Zeya DLX 500 stil et spørgsmål nedenfor, og andre brugere vil svare dig
Fuld Vango Manualer
28 December 2024
28 December 2024
28 December 2024
28 December 2024
28 December 2024
28 December 2024
28 December 2024
28 Maj 2024
27 Maj 2024
27 Maj 2024
Fuld Manualer
- Fuld Thule
- Fuld Biltema
- Fuld Isabella
- Fuld Crivit
- Fuld Dometic
- Fuld Outwell
- Fuld Thermex
- Fuld Coleman
- Fuld Hilleberg
- Fuld Skandika
- Fuld Wood's
- Fuld Trigano
- Fuld Rollei
- Fuld Perel
- Fuld Bestway
- Fuld Fiamma
- Fuld Eureka
- Fuld Black Diamond
- Fuld Asaklitt
- Fuld MSR
- Fuld Sierra Designs
- Fuld Outdoor Connection
- Fuld SereneLife
- Fuld Kelty
- Fuld Dwt-Zelte
- Fuld Wechsel
- Fuld De Waard
- Fuld Vaude
- Fuld Grand Canyon
- Fuld Jamet
- Fuld TOOLPORT
- Fuld Nordisk
- Fuld Yamazen
- Fuld Alice & Fox
Nyeste Fuld Manualer
31 December 2025
31 December 2025
31 December 2025
30 December 2025
30 December 2025
29 December 2024
29 December 2024
27 December 2024
27 December 2024
27 December 2024